Radiogram No. 8975u   

 

Form 24 for 11/05/08 

KOMPARUS SYSTEM R&R 

GMT

 

CREW

 

ACTIVITY

 

06:00-06:10 

CDR, FE-1 

Morning Inspection 

06:00-06:05 

SLEEP - Data Log (FE2) 

06:05-06:15 

FE-2 

Morning Inspection 

06:10-06:40 CDR, 

FE-1 

06:15-06:45 FE-2 

Post-sleep 

06:40-07:30 CDR, 

FE-1 

06:45-07:30 FE-2 

BREAKFAST 

07:30-07:45 

Daily Planning Conference 

(S-band)

 

07:45-08:10 

 

Prep for Work 

08:10-09:50 CDR, 

FE-1 

Komparus 

А

3 System R&R(

КД

-

МПА

-01 removal). 

Tagup with specialists as 

necessary (S-band)

 

08:10-08:15 

Connect DCP Power Cable 

08:15-09:45 

Physical Exercise (RED) 

09:45-10:45 

FE-2 

Physical Exercise (CEVIS) 

CDR 

Physical Exercise (RED) 

09:50-11:20 

FE-1 

Physical Exercise (TVIS), day 4  

10:45-11:10 

Restart JEU and EXT2 power 

11:10-11:20 

FE-2 

PTU ELBOW activation and configuration for inspection 

11:20-13:00 CDR, 

FE-1 

Komparus 

А

3 System R&R (Remove boxes 

ТА

 601 

БКЗ

-1, 

ТА

601 

БКЗ

-2, 

КС

1-

МПА

-01). 

Tagup with specialists as necessary (S-band) 

 

11:20-12:20 

Hardware Pre-pack for Return on Shuttle Flight ULF2 

12:40-12:45 

Cupola RWS PCS Power Up 

12:45-13:05 

FE-2 

Starting DOUG software to support SSRMS ops 

13:00-13:05 FE-1 

On MCC Go

 ISS O2 repress from Progress 365 

СрПК

 (start) / 

13:05-14:05  

LUNCH 

14:05-14:10 

FE-1 

ISS O2 repress from Progress 365 

СрПК

 (terminate)  

14:05-14:35 

CDR, FE-2 

SSRMS External Stowage Platform 3 (ESP-3) Grapple 

14:10-16:10 FE-1 

Removal of Komparus A3 units (de-mate connectors from 

КР

-

МПА

 and 

КД

-

МПА

Tagup with specialists as necessary (S-band)

 

14:35-15:05 

Demating Umbilical Mechanism Assembly (UMA) and Deploying Capture Latch 
Assembly (CLA) 

15:05-17:05 

CDR, FE-2 

SSRMS Grappling LAB PDGF 

16:10-16:40 

Cleaning LIV TVS Voltage Converter Ventilation Grille  

16:40-17:15 

FE-1 

Elektron Purge / r/g 

17:05-18:05 CDR 

Physical Exercise (CEVIS) 

17:05-17:10 

PCS power down 

17:10-17:50 

FE-2 

СОЖ

 Maintenance. 

Verify 

ИП

-1 sensor installation 

 

17:15-18:15 

FE-1 

Physical Exercise (VELO+RED), Day 4 

17:55-18:55 

FE-2 

Evening Work Prep 

18:15-18:30 FE-1 

Replacement 

of 

ИК

0501 CO2 filter unit 

(Install #031 

ш

/

к

 008546R, 

background image

Page 2 of 2 

СМ

1

РО

_4_449_1 bag #363-25. Discard the removed unit. Update IMS.)

 

18:15-19:15 CDR 

18:30-19:15 FE-1 

Evening Work Prep 

18:55-19:05 

PTU ELBOW reconfig for stowage and deactivation 

19:05-19:15 

FE-2 

JEMRMS Deactivation Prep 

19:15-19:30 

 

Daily Planning Conference 

(S-band)

 

19:30-20:30 FE-2 

19:30-21:30 CDR, 

FE-1 

Presleep (Dinner, Daily Food Prep, Evening Toilet) 

20:30-21:00 Crew 

conference 

21:00-21:25 

Presleep (Dinner, Daily Food Prep, Evening Toilet) 

21:25-21:30 

FE-2 

Log entry reminder 

21:30-06:00  

SLEEP 

Task List

 

FE-1 

IMS Update  

Notes: 

1. SM Window #9 shutter opening is at crew discretion with 

Report to MCC

  

2. See OSTP for references to US activities. 
End of Radiogram